# Planned Preventive Maintenance: A Guide for Leasehold Blocks

How to set up planned preventive maintenance for a leasehold block: legal duties, the seven steps, reserve fund planning and cost control.

Planned preventive maintenance (PPM) for a leasehold block is a scheduled programme of inspections, servicing, and repairs carried out before components fail. It keeps the building legally compliant, protects leaseholders from large unplanned bills, and satisfies the RICS Service Charge Residential Management Code (4th edition), which took effect on 7 April 2026.

## Key takeaways

- PPM is a scheduled programme of inspections, servicing and repairs carried out before things fail.
- Fire safety, gas, electrical, water hygiene and lift inspections are legal duties, not options.
- A PPM plan gives the reserve fund a costed, defensible basis.
- Planned work avoids emergency rates and gives time for Section 20 consultation.

This guide walks resident directors and managing agents through the legal duties that make PPM necessary and the financial logic behind it.

## What Is Planned Preventive Maintenance and How Does It Differ from Reactive Maintenance?

Planned preventive maintenance is work scheduled in advance, at fixed intervals or on condition, to stop building components from failing. The opposite is reactive maintenance: work ordered only after something breaks or stops working. In a leasehold block, the difference between the two approaches has direct consequences for service charges and legal compliance.

Reactive maintenance, sometimes called unplanned maintenance, comes in two main forms. Emergency reactive work is unscheduled and urgent: a burst pipe, a failed entry system, a lift breakdown. Non-emergency reactive work is also unscheduled but less time-critical, such as replacing a broken communal light fitting reported by a leaseholder. Both types share one problem: they arrive without warning, which makes budgeting for them almost impossible.

The cost gap between the two approaches is significant. Reactive repairs usually cost more than planned work: emergency call-out rates, secondary damage and rushed procurement all add to the bill.

Condition-based maintenance is a related approach where the trigger is the observed state of a component rather than a fixed calendar date, for instance, inspecting a flat roof after a severe storm rather than waiting for the next scheduled visit. A well-designed PPM programme often combines both: fixed intervals for statutory duties, condition-based checks for elements where deterioration is variable.

The practical question for resident directors and managing agents is not whether to do preventive maintenance, but how to structure it so that nothing statutory is missed and costs are spread predictably across service charge years.

## What Are the Legal Duties That Make PPM Compulsory for Leasehold Blocks?

Several overlapping legal frameworks require leasehold blocks to maintain building systems and fabric to a defined standard. PPM is the mechanism through which those duties are discharged.

The **Fire Safety Act 2021** and the Fire Safety (England) Regulations 2022 require the responsible person for a multi-occupied residential building to carry out and regularly review a fire risk assessment, maintain fire doors, and keep fire safety equipment in working order. These are ongoing duties, not one-off events, and they map directly onto a PPM schedule.

The **Building Safety Act 2022** goes further for higher-risk buildings (those 18 metres or over, or with seven or more storeys). It requires the accountable person to maintain a digital safety case and a "Golden Thread" of information, a live record of safety-critical decisions, inspections, and works. Even for buildings below the higher-risk threshold, the Act has shifted expectations across the sector: regulators and leaseholders now expect documented maintenance histories, not just completed works.

The **RICS Service Charge Residential Management Code (4th edition)** took effect on 7 April 2026. It expects managing agents and resident directors to maintain costed, forward-looking maintenance plans for the blocks they manage. This is not a statutory instrument with criminal penalties, but it is government-approved guidance, and a First-tier Tribunal will take compliance with it into account when assessing whether service charges are reasonable. Failing to follow it is not a technicality: it is evidence of poor management practice.

For resident directors managing their own block, these duties sit alongside the general obligation under the Landlord and Tenant Act 1985 to keep the structure and common parts in repair. Quality maintenance, in the sense the RICS code uses the term, means maintenance that is planned, costed, and documented, not just maintenance that gets done eventually.

The [RICS Service Charge Code: What the New Standards Mean for Your Block](https://manage.management/blog/rics-service-charge-code-what-the-new-standards-mean-for-your-block) article covers what the 4th edition requires of your block in detail.

## How Does a PPM Plan Affect Your Reserve Fund?

A PPM plan and a reserve fund are two sides of the same financial decision. The plan tells you what work is coming and when; the reserve fund is how you pay for it without issuing large one-off demands to leaseholders.

When a block has no PPM plan, the reserve fund is essentially a guess. Directors set a contribution level based on habit or rough precedent, and the fund either runs short when a major item fails or accumulates more than is needed. A shortfall means a demand that leaseholders may challenge; an over-funded reserve invites questions about why service charges are so high.

A costed PPM schedule changes this. Once you know that the roof will need replacing in approximately fifteen years, that the lift contract comes up for renewal in three, and that external redecoration is due in five, you can work backwards to calculate the annual contribution needed to fund each item without a shortfall. This is the basis of a long-term maintenance plan, which the RICS code now expects as standard practice.

The relationship between PPM and Section 20 consultation is also financial. Under the Landlord and Tenant Act 1985, if a single set of qualifying works will require any one leaseholder to contribute above a per-leaseholder threshold, the freeholder or management company must follow the Section 20 consultation process before committing to the works. A PPM plan that identifies major items years in advance allows the reserve fund to be built up so that the per-leaseholder contribution stays below that threshold, avoiding the consultation process entirely in some cases, or at least entering it with a fully costed specification rather than an emergency brief.

Research suggests that moving from reactive to preventive maintenance can deliver cost savings of 12% to 18%. For a block with a substantial annual service charge budget, that margin is material, and it compounds over time as components last longer and emergency call-out costs fall.

## The 7 Steps of Planned Maintenance for a Leasehold Block

Building a PPM programme from scratch follows a logical sequence. Work through these seven steps in order and you will have a programme that covers statutory duties, reflects your building's actual condition, and produces the costed forward plan the RICS code now expects.

1. **Commission a building condition survey.** Before you can plan maintenance, you need an accurate picture of what you have and what state it is in. A qualified surveyor should inspect the structure, roof, communal areas, mechanical and electrical systems, and any shared plant. The survey output is your baseline: a list of components, their current condition, and an estimated remaining useful life for each.
2. **Identify all statutory maintenance obligations.** Work through the building's legal duties, fire alarm testing, emergency lighting checks, lift inspections, fire door surveys, legionella risk assessments, Electrical Installation Condition Reports (EICRs), and any obligations under the Building Safety Act 2022 for higher-risk buildings. These have fixed intervals set by regulation or statute and are non-negotiable. List them separately so they cannot be deprioritised when budgets are tight.
3. **Assign maintenance intervals based on manufacturer guidelines and statutory duties.** [S1] For each component identified in the survey, set a maintenance interval. Statutory items have their intervals set for you. For non-statutory items, gutters, external decoration, flat roofs, communal carpets, use manufacturer guidance, lease obligations, and widely accepted industry practice as your reference points. Where condition-based maintenance is more appropriate than a fixed calendar (a pitched roof in good condition, for example), document the trigger condition rather than a date.
4. **Cost each item and build a forward schedule.** Assign an estimated cost to every maintenance and replacement item across a planning horizon of at least ten years, ideally twenty. Group items by year. This produces the long-term maintenance plan that underpins your reserve fund calculations and satisfies the RICS code's expectation of a costed, forward-looking programme.
5. **Set reserve fund contributions.** Using the costed schedule, calculate the annual contribution needed to fund each future item without a shortfall. Review the current reserve fund balance and adjust contributions in the next service charge budget accordingly. Where a major item falls within the next three to five years and the fund is short, consider phased increases rather than a single large adjustment.
6. **Implement a digital record, the Golden Thread.** [S2] For higher-risk buildings under the Building Safety Act 2022, maintaining a digital Golden Thread of safety information is a legal requirement. For all other blocks, it is increasingly expected practice. Log every inspection, service visit, and completed work against the relevant component, with dates, contractor details, and any follow-up actions. This record protects directors in a dispute, satisfies the RICS code, and gives any incoming managing agent or new director an accurate handover.
7. **Review and update the programme annually.** A PPM plan is not a document you file and forget. Each year, review completed works against the schedule, update cost estimates for future items, reassess any components whose condition has changed, and revise reserve fund contributions if the picture has shifted. The annual service charge budget cycle is the natural moment to do this.

## Planned Preventive Maintenance Examples: Cyclical Schedules for Common Block Elements

The table below sets out widely accepted maintenance intervals for elements commonly found in residential leasehold blocks. These intervals reflect general industry practice and, where applicable, statutory requirements. They are a starting point: your building's specific lease obligations, component age, and condition survey findings may require different intervals.

Splitting your schedule into internal communal areas and external building fabric makes it easier to assign responsibility, group contractor visits, and present the programme to leaseholders in a way they can follow. Statutory items should always appear as a distinct category so that anyone reviewing the schedule can confirm compliance at a glance.

A planned preventive maintenance example that combines several of these: a block commissions gutter clearance every autumn, pairs it with a visual roof inspection, and schedules the more detailed five-yearly masonry survey to coincide with the external redecoration cycle. Grouping visits this way reduces mobilisation costs and means scaffolding, where needed, is erected once rather than twice.

## Section 20 Consultation: When Does Your PPM Plan Trigger It?

Under the Landlord and Tenant Act 1985, a freeholder or management company must follow the Section 20 consultation process before carrying out qualifying works where the contribution required from any one leaseholder exceeds a set per-leaseholder threshold. The process involves issuing formal notices, inviting observations, and obtaining at least two competitive estimates before committing to the works.

When major items, a roof replacement, a lift renewal, a full external redecoration, are identified years in advance and funded through steady reserve fund contributions, the per-leaseholder contribution at the point of works may fall below the threshold entirely. That is one of the clearest financial arguments for long-term PPM planning.

Where the threshold is crossed, the PPM plan still helps. Entering a Section 20 process with a fully costed specification, a clear scope of works, and documented evidence that the works were anticipated and planned is a much stronger position than commissioning emergency repairs under time pressure. Tribunals and leaseholders both respond better to evidence of forward planning.

Reactive maintenance creates the most difficult Section 20 situations. A sudden failure, a structural defect discovered unexpectedly, a roof that deteriorates faster than projected, may require urgent works that cross the threshold with little time to run the full consultation process properly. You can read a detailed walkthrough of the consultation stages in the guide to [Section 20 Works: A Leaseholder's Guide to Major Works Consultation](https://manage.management/blog/section-20-works-a-leaseholder-s-guide-to-major-works-consultation).

## How Manage.Management Supports Your Block's Maintenance Records

[Manage.Management](https://manage.management/) is a shared workspace for leasehold buildings. For the seven-step PPM process, it gives you a single location to store condition survey outputs, log every inspection and service visit against the relevant component, and hold the documentary record that satisfies both the RICS code and the Building Safety Act's Golden Thread requirement. Cyclical schedules can be shared directly with leaseholders, so the maintenance programme is visible to everyone with a stake in it. Resident directors can find out more about the tools available to them on the [resident directors page](https://manage.management/directors).

## Frequently asked questions

### What is the difference between planned and preventive maintenance?

The two terms are often used interchangeably, and in most block management contexts they mean the same thing: work scheduled in advance to prevent failure rather than respond to it. Some practitioners use "preventive maintenance" to describe the broader approach and "planned preventive maintenance" to describe a formally documented programme with costed schedules and assigned intervals. For leasehold blocks, the distinction rarely matters in practice.

### What does condition-based maintenance mean in a block management context?

Condition-based maintenance means the trigger for a visit or repair is the observed state of a component, not a fixed calendar date. A flat roof might be inspected annually but also after any severe storm. A pitched roof in good condition might be surveyed every five years unless a visual check from ground level suggests deterioration. It sits alongside fixed-interval maintenance in most PPM programmes rather than replacing it.

### Can a self-managed block without a managing agent still comply with the RICS code?

Yes. The RICS Service Charge Residential Management Code (4th edition) applies to how blocks are managed, not to who manages them. Resident directors running a self-managed block are expected to follow its standards in the same way a professional managing agent would. In practice, this means maintaining a costed forward maintenance plan, keeping proper records, and setting reserve fund contributions that reflect anticipated expenditure.

### How often should a leasehold block commission a full building survey for PPM purposes?

There is no statutory interval, but widely accepted practice is every five years for a full condition survey, with interim reviews when the annual programme reveals unexpected deterioration or when a major component approaches the end of its projected useful life. A new survey is also sensible when a block changes management, since it gives incoming directors or agents an accurate baseline rather than relying on records inherited from a predecessor.

### What records must be kept as part of the Golden Thread under the Building Safety Act?

For higher-risk buildings (those 18 metres or over, or with seven or more storeys), the Building Safety Act 2022 requires the accountable person to maintain a digital record of safety-critical information: structural drawings, fire safety assessments, details of building work, and the history of safety-related decisions and inspections. For buildings below the higher-risk threshold, there is no identical statutory duty, but the principle of a maintained, accessible maintenance history is now expected practice across the sector and is consistent with the RICS code's requirements.

## Conclusion

Planned preventive maintenance is not a facilities-management concept borrowed from industry. For leasehold blocks in England and Wales, it is the practical mechanism through which statutory fire safety duties, Building Safety Act obligations, and the RICS code's expectation of costed forward planning are all met at once. A block with a structured PPM programme pays less over time, avoids emergency Section 20 situations, and gives leaseholders the predictable service charges they are entitled to expect.

The most useful next step is to check whether your block already has a condition survey less than five years old. If it does, you have the baseline you need to build or update a forward maintenance schedule. If it does not, commissioning one is the first practical action, and the seven-step process in this guide gives you a clear path from that survey to a fully costed, annually reviewed programme.

Last reviewed: 29 October 2026 by Franklin Baeza, Manage.Management. This article is general information for England and Wales, not legal advice. Check the current position with a qualified adviser before acting.

---